İnançlar Petrol
Our Projectschevron_rightElectrical Projectschevron_rightİnançlar Petrol
Our Electrical Projects

İnançlar Petrol

location_onSakarya PamukovaSakarya

About the Project

Completed power upgrade from 54kW to a 400kW transformer, plus LV/MV installation and infrastructure modernization for İnançlar Petrol in Sakarya Pamukova.

We executed a large-scale power upgrade to meet the high capacity needs of the İnançlar Petrol Pamukova station.

Capacity was increased from 54kW to a 400kW transformer level, securing uninterrupted energy for fuel retail operations.

LV/MV distribution, weak current, and infrastructure works were delivered turnkey by Gürsan Enerji, with transformer integration commissioned to site standards.

arrow_backBack to All Projects

Project Scope

electric_bolt
Güç Artışı
check_circle
Alçak Gerilim
check_circle
Orta Gerilim
check_circle
Zayıf Akım
check_circle
Altyapı Projesi
check_circle
54kW → 400kW Trafo

Location

Sakarya Pamukova

City

Sakarya

Let's Strengthen Your Electrical Infrastructure

Contact our expert team for LV/MV, power upgrades, internal installation, project drawings and commitment works.

Contact Usarrow_forward