Our Electrical Projects
İstanbul Şeker
location_onAntalya Merkez•Antalya
About the Project
Completed power upgrade from 5kW to 39kW, LV/MV installation, and weak current infrastructure for the İstanbul Şeker facility in central Antalya.
We executed a power upgrade tailored to production and operations at the İstanbul Şeker Antalya facility.
Capacity was raised from 5kW to 39kW, strengthening energy continuity and infrastructure safety.
Turnkey LV, MV, and weak current installation was managed by Gürsan Enerji specialist teams.
Project Scope
electric_bolt
Güç Artışıcheck_circle
Alçak Gerilimcheck_circle
Orta Gerilimcheck_circle
Zayıf Akımcheck_circle
Altyapı Projesicheck_circle
5kW → 39kWLocation
Antalya Merkez
City
Antalya
Let's Strengthen Your Electrical Infrastructure
Contact our expert team for LV/MV, power upgrades, internal installation, project drawings and commitment works.