Our Electrical Projects
Oksijen Petrol
location_onSakarya Güneşler•Sakarya
About the Project
Modernized LV/MV and weak current electrical infrastructure with a power upgrade from 16kW to 50kW for Oksijen Petrol in Sakarya Güneşler.
We executed a power upgrade and infrastructure renewal to increase energy capacity at Oksijen Petrol Güneşler.
The system was raised from 16kW to 50kW to keep fuel retail operations running without interruption.
LV, MV, and weak current works were completed turnkey under Gürsan Enerji engineering.
Project Scope
electric_bolt
Güç Artışıcheck_circle
Alçak Gerilimcheck_circle
Orta Gerilimcheck_circle
Zayıf Akımcheck_circle
Altyapı Projesicheck_circle
16kW → 50kWLocation
Sakarya Güneşler
City
Sakarya
Let's Strengthen Your Electrical Infrastructure
Contact our expert team for LV/MV, power upgrades, internal installation, project drawings and commitment works.