Aycan Prime Suite Solar
Our Projectschevron_rightSolar Energy Projectschevron_rightAycan Prime Suite Solar
Commercial Solar

Aycan Prime Suite Solar

location_onAntalya, Turkeybolt28,60 kWpcalendar_month2023

About the Project

In Antalya, we completed the Aycan Prime Suite Solar (Güneş Enerji Sistemleri) project with an installed capacity of 28.60 kWp. With annual energy production of 45.760 kWh, this project saved 55 trees and prevented 22.652 tons of carbon dioxide emissions per year.

We thank Aycan Prime Suite for choosing us for this eco-friendly investment.

At Gürsan Enerji, we stand by you with professional and innovative solutions for sustainability in green energy.

arrow_backBack to All Projects

Project Specifications

AC Capacity
25,00 kWe
DC Capacity
28,60 kWp
Annual Energy Production
45.760 kWh
Equivalent Trees Saved
55 Trees
CO₂
Equivalent CO₂ Emissions Avoided
22.652 tons/year
Location
Antalya

Bring Your Project to Life

Contact us for a free exploration and feasibility analysis.

Get in Toucharrow_forward