Commercial Solar
Koca Tarım Solar
location_onMuğla, Turkey•bolt12,88 kWp•calendar_month2022
About the Project
In Muğla, we completed the Koca Tarım Solar (Güneş Enerji Sistemleri) project with an installed capacity of 12.88 kWp. With annual energy production of 20.480 kWh, this project saved 25 trees and prevented 10.077 tons of carbon dioxide emissions per year.
We thank Koca Tarım for choosing us for this eco-friendly investment.
At Gürsan Enerji, we stand by you with professional and innovative solutions for sustainability in green energy.
Project Specifications
AC Capacity
11,70 kWe
DC Capacity
12,88 kWp
Annual Energy Production
20.480 kWh
Equivalent Trees Saved
25 Trees
Equivalent CO₂ Emissions Avoided
10.077 tons/year
Location
Muğla
Bring Your Project to Life
Contact us for a free exploration and feasibility analysis.