Ground-Mount Solar
Tekinler Ground-Mount Solar
location_onAfyonkarahisar, Turkey•bolt1.199,00 kWp•calendar_month2023
About the Project
In Afyonkarahisar, we completed the Tekinler Ground-Mount Solar (Güneş Enerji Sistemleri) project with an installed capacity of 1.199 kWp. With annual energy production of 1.822.480 kWh, this project saved 2.182 trees and prevented 896.661 tons of carbon dioxide emissions per year.
We thank Tekinler for choosing us for this eco-friendly investment.
At Gürsan Enerji, we stand by you with professional and innovative solutions for sustainability in green energy.
Project Specifications
AC Capacity
999,00 kWe
DC Capacity
1.199,00 kWp
Annual Energy Production
1.822.480 kWh
Equivalent Trees Saved
2.182 Trees
Equivalent CO₂ Emissions Avoided
896.661 tons/year
Location
Afyonkarahisar
Bring Your Project to Life
Contact us for a free exploration and feasibility analysis.